How would you convince your Boss that your CMM needs a Software Upgrade? (Mcosmos)



A few things to myself. Im working in a midsized Composite Plant, which produces primary Materials as Tubes and Plates. We also got a Shopfloor with around 15 CNC machines.

My primary responsibility is meassureing the finished Parts on a Mitotoyo Crystal Apex with Mcosmos 4.

Im used to the Software, and have no problems with programming everything with teach in. Even tho its a pain in the ass.

I would however like to move towards offline programming, the programm u need for that is Cat1000p, wich costs around 5k USD. Software upgrade from mcosmos 4 to 5 would be optional.

Do you guys have any good arguments for me? Have you been in a similar Situation?

submitted by /u/BilliardBabo420
[visit reddit] [comments]



Source link

Related Posts

About The Author

Add Comment